logo
square E-STORE
$ USD down

Однокомнатная квартира, 35.9м2

Artville, building 10, floor 2 ID: AB-10-02/0016б
one-room european layout (bedroom + kitchen-living room) Ванная
Flat ID
AB-10-02/0016б
Building
10
Floor
2
Number of rooms
1
Area
35.90 m2

About the flat

Квартира AB-10-02/0016б находится на 2 этаже в доме №10 жилого городка Artville.

При покупке квартиры в комплектации full, в вашей кухне-студии, площадью 10.50 м2, будет сразу установлена кухонная мебель, вытяжка, духовка, варочная поверхность и вся сантехника.

Площадь санузла — 3.84 м2. Здесь помещается душевая кабина, вся необходимая сантехника и стиральная машина.

Комнаты объединяет коридор, площадью 4.42 м2.

Specification

Flat ID
AB-10-02/0016б
Building
10
Floor
2
Area
35.90 m2
Number of rooms
1
Bathroom area
3.84 m2
Corridor area
4.42 m2
Kitchen area
10.50 m2
Room area
16.86 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Artville/ Building 10/ 2 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
AB-10-02/0016б
Building
10
Floor
2
Area
35.90 m2
Number of rooms
1

Construction progress

ARTVILLE - installation of window structures, building #5
ARTVILLE - installation of window structures, building #5
09.01.2025
We start the year with great news from building #5! We are installing window structures on the 7th floor. The work is carried out in stages and in...

We start the year with great news from building #5!

We are installing window structures on the 7th floor. The work is carried out in stages and in accordance with the technology.

Follow our news to stay up to date!

ARTVILLE - plumbing installation, building #15
ARTVILLE - plumbing installation, building #15
05.12.2024
Work continues in building #15! We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check...

Work continues in building #15!

We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check it during work to make sure there are no leaks. After all, your further comfortable stay depends on it.

Stay with us to always be up to date with the construction processes!

ARTVILLE - installation of electrical fittings, building #15
ARTVILLE - installation of electrical fittings, building #15
28.11.2024
Work continues in building #15! Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step...

Work continues in building #15!

Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step towards the comfort of future residents.

All sockets are conveniently located so that you can easily and effectively use them to connect electrical appliances

ARTVILLE - preparation for handing over the keys, house #15
ARTVILLE - preparation for handing over the keys, house #15
07.11.2024
Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors. We always care about your...

Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors.

We always care about your first impression of your new home, so we make it shine. All you have to do is furnish it to your taste.

So the next apartments on the 4th floor are already waiting for their owners, and as usual, we will film your emotions when handing over the keys

Permits

GASI certificate on commissioning of house No.10
The decision to assign an address to house No.10
Лицензия на создание объектов архитектуры
Permission to perform construction works dated 11/14/2017
Permission to perform construction works dated 25.01.2019
Разрешение на выполнение строительных работ от 12.08.2021

Stages of construction

Commissioning date I qtr. 2021
Building 10
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

ARTVILLE - preparation for handing over the keys, house #15

07.11.2024

Similar flats in Artville

Price 38 000$ ₴1 633 240
Commissioning date II qtr. 2026
Area 34.84 m2
Price 39 400$ ₴1 693 420
Commissioning date II qtr. 2026
Area 30.48 m2
Price 40 000$ ₴1 719 200
Commissioning date II qtr. 2026
Area 32.79 m2
Price 42 000$ ₴1 805 160
Commissioning date II qtr. 2026
Area 36.66 m2

Similar flats in other projects

Price 35 772$ ₴1 537 490
Commissioning date I qtr. 2026
Area 32.4 m2
Price 40 000$ ₴1 719 200
Commissioning date I qtr. 2026
Area 41.16 m2
Price 40 500$ ₴1 740 690
Commissioning date II qtr. 2025
Area 34.39 m2
Price 42 445$ ₴1 824 290
Commissioning date I qtr. 2026
Area 32.5 m2