Commercial premises, 41.17m2

Artville, building 21, floor -1 ID: AB-21-м1/Т0004
59 697$ ₴2 378 930

Without decoration

59 697$
₴2 378 930
Commercial premises ID
AB-21-м1/Т0004
Building
21
Floor
-1
Area
41.17 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 60 mos. from 6 208$₴247 390 from 1 114$₴44 400/mos.
Interest-free with decoration Basic-full to 48 mos. from 24 118$₴961 110 from 742$₴29 570/mos.
Super light with decoration Basic-light to 60 mos. from 6 208$₴247 390 from 0$₴0/mos.
Interest-free with decoration Basic-light to 48 mos. from 24 118$₴961 110 from 0$₴0/mos.
Super light without decoration to 60 mos. from 6 208$₴247 390 from 0$₴0/mos.
Interest-free without decoration to 48 mos. from 24 118$₴961 110 from 0$₴0/mos.

About commercial premises

Коммерческое помещение AB-21-м1/Т0004, площадью 41.17 м2, расположено на -1 этаже в жилом городке Artville.

В жилом городке Artville вы можете реализовать свою бизнес-идею или воспользоваться готовыми решениями. Например, открыть зоомагазин, пекарню, продуктовый, овощной или небольшое кафе.

Specification

Commercial premises ID
AB-21-м1/Т0004
Building
21
Floor
-1
Area
41.17 m2

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
AB-21-м1/Т0004
Building
21
Floor
-1
Area
41.17 m2

Calculator

Minimum payment $

Stages of construction

Commissioning date I qtr. 2026
Building 21
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Monolithic works

20.12.2023